The following is the online version of the MAPCON User Manual for the software version indicated in the Table of Contents. The Manual provides a detailed description for the users of our CMMS including our CMMS Software, Maintenance Software and Preventive Maintenance Software operations and methodology. Please feel free to send us your comments via email.
Previous Page | Table of Contents | Next Page
Job Steps/Material/Equipment Page
Craft - Enter the Craft Code. A Lookup is available. Use Browse button to view the craft in its data entry window.
Tsk - The Task Number will default to the next sequential number for each entry in the Craft field and can not be changed. The Work Order can contain multiple tasks.
Tasks can be sequential (following one another) or parallel (being done at the same time). Tasks are placed in a matrix by describing each Task's predecessors. A predecessor is a Task that precedes a Successor Task in a sequential path. A Task can have multiple predecessors. Only the predecessor relationships need to be defined while building the matrix. The system will automatically determine the successor relationships when the predecessors are defined. The Task matrix will be used by the Scheduling System.
Click on Detail to assign predecessors.
Job Steps - Click on Zoom to get an expanded text entry box. Then, enter a description of the work to be completed for this Task.
Job Steps can be selected from a Job Step Catalog. Click on Lookup to get a selection list. After a Job Step is selected, its Number will be displayed in brackets, i.e. [00123]. It may be viewed by clicking on View.
#MEN - Enter the estimated number of Men that will be dispatched simultaneously to complete the work. The Men Avl field displays the number of Men that are available. Click on Lbr Std to see the Labor Standard that was entered with the Job Step.
#Hrs - Enter the estimated number of Hours that the Number of Men estimated will be on the job. Two Men for eight hours means a total of sixteen man-hours. Click on Lbr Std to see the Labor Standard that was entered with the Job Step.
Material for Work Order:
This Group of entries is for parts required to perform the Job Steps. Enter as many parts as required. An Issue Ticket will automatically be generated when a Work Order is generated using the PM Description.
Stock # - Enter only those Stock Numbers that will be used for all Maintained Entities that the PM Description will be attached to. Parts that are specific to an Equipment / PM Description combination can be specified in the Equipment record. A Lookup is available. Also available is the Browse button to view part information through the Inventory Data Entry screen.
Stockroom - Enter the Stockroom from which the part will be issued. A Lookup is available.
Req Qty - Enter the Required Quantity.
Equipment/Locations/Cost Centers/Routes for PM:
CD- Enter E for Equipment, L for Location, C for Cost Center or R for Route. A Lookup is available.
EQP/LOC/CC/R - Enter the number of the piece of Equipment, Location, Cost Center or Route. A Lookup is available. Click Edit PM button to access the PM Frequency Setup window in an overlay screen.
Click on Save to save the record after the desired information has been entered on ALL screens.
Previous Page | Table of Contents | Next Page
Learn more about MAPCON CMMS Software
Contact us today. Our primary preventive maintenance software products are MAPCON Jemms, MAPCON Pro and MAPCON Lite. We provide full support (a real human right here in the United States) and training both on-site or at our classrooms in Des Moines, Iowa.
Call us at 1-800-922-4336 or go right to our Downloads Page and select your solution!
To Top